Installation Instructions:
1. This product should be installed in the line or equipment whose rated voltage is consistent with the rated voltage of the arrester;
2. Please check the tightness between lighning arrester element and dropout before installation to ensure good contact and flexible disasembling.
3. Adjustment method: turn the copper contacts (with a pull-tab) to make its separating tension within 6-10kg; and keep the pull-tag side of copper contact outside, then slightly tighten the nut to fix the pull-tag.
4. Druing installation, the arrester and plump line should keep a 15-30 degrees of in included angle, and the opposition distance should be no less than 200mm. |